MHEP-Bhutan commissions Ultra-Modern control room for Hydroelectric project

Pyrotech Workspace provides highest-quality and heaviest-duty control room for all segments including Hydroelectric.Our control room interior solutions are designed inline with International Norms for Ergonomics i.e. ISO 11064. The solution provided is much more durable, 100% modular and comes with unmatchable superior quality and reflecting a glimpse of their cultural identity. The project required highly customizable and ergonomic solutions to help them find their comfort zone and minimize distractions.

Today, we continue our legacy of setting high standards for the power sector with our immense control room solutions & innovative technology.We combine our technology and experience with a broad range of products and services to offer the most comprehensive, knowledge-driven approach to improving performance.As the premier source of proven control technology and applications expertise, Pyrotech Workspace delivers superior & customized control rooms for all the sector. Our Control Room solutions are designed and built to withstand the most challenging environments.

 

You specify what you require and Pyrotech Workspace delivers  exactly as per your Expectations:

 

  1. Greater cost-efficient deals for your Organization.
  2. We offer the best Integrated Design and Installations.
  3. Our control room solutions are built on Quality control and Quality Assurance Parameters.
  4. We delivered control rooms to our respective customers after complete testing and inspection.
  5. Reduced installation hassles.

Pyrotech workspace Solutions are Proud to Announce the First Order Grabbed from Bhutan:-Mandedechhu Hydroelectric Project

 

Mangdechhu Hydroelectric Project:

Mangdechhu Hydroelectric Project (720MW) is one amongest the ten hydroelectric Projects planned under the 10,000MW hydropower development by the year 2020 programmme of Royal Government of Bhutan supported by the Government of India. An agreement for execution of Mangdechhu Hydroelectric Project was signed between the two governments on 30th April 2010 at the approved cost of Nu./Rs. 33821.58 million (March 2008 price level) to be funded by GoI(Govt of India)  as 30% grant and 70% loan at 10% annual interest to be paid in thirty equated semiannual installments. The tentative project cost has now become Nu. /Rs. 38006.90 million. The Mangdechhu Hydroelectric Project Authority was subsequently constituted on 8th June 2010. The Authority comprises of Chairperson and four members nominated by the Royal Government of Bhutan and three members nominated by the Government of India. The Project Management is headed by the Managing Director, who is being assisted by a Joint Managing Director, Director (Technical) and Director (Finance). NHPC Limited, a Central Public Sector Undertaking of GoI(Govt of India) is the Design and Engineering consultant to the Project. The project is scheduled for commissioning by September-2017.

 

PROJECT SALIENT FEATURES:

The 720 MW Mangdechhu Hydroelectric Project is located on river Mangdechhu in Trongsa Dzongkhag (District) in Central Bhutan. The project envisages construction of one Concrete Gravity Dam (Height 56m above the river bed, length at Top 141.28m, Top width 10m); one Diversion Tunnel (dia. 8.5m, length 670m); 4 nos. Spillway (orifice type, 70m long, the width of each bay s10m); 2 nos. Intake Tunnels (5m x 5m length 126 & 173m); 2 nos. Desilting Chamber (width 14m, height 17.7m and 340m long);  one HRT (Horse shoe type, dia. 6.5m, length 13561m); one Surge Shaft (dia. 13.5m, Height 152m); 2 nos. Pressure Shaft (steel lined, Dia 3.5m, length 1856m each); 4 nos. Penstock (dia. 2.5m, length 63m each); Underground Power House (size 155m x 23m x 41m, and 135m x 18m x 23m GIS, Pelton Turbine, Rated Head 692m; TRT (Horseshoe shape, dia. 8m, length 1295m). The power evacuation of the project has been planned through 400 kV Mangdechhu-Jigmeling via. Goling Transmission Line. The annual energy generation from the Project with 95% machine availability would be 2925.25 MU.

 

Contact Us:-

For more information to know how we can customize control room solutions to fit your need, please visit our website:-www.pyrotechworkspace.com

Address- Bhamashah Industrial Area, Kaladwas, Udaipur, Rajasthan-313002, India